Your selections:
Project scheduling improvement using design structure matrix
- Gunawan, Indra, Ahsan, Kamrul
Cyclic production for robotic cells served by multi-function robots with resumable processing regime
- Foumani, Mehdi, Ibrahim, Yousef, Gunawan, Indra
Scheduling rotationally arranged robotic cells served by a multi-function robot
- Foumani, Mehdi, Gunawan, Indra, Ibrahim, Yousef
Application of design structure matrix in project management
- Gunawan, Indra, Singh, Darius
The Role of industrial engineering in supporting the growth of competitive ICT industry
Analysis of cost and schedule performance of international development projects
- Ahsan, Kamrul, Gunawan, Indra
Application of numerical design structure matrix method in engineering projects management
Redundant paths and reliability bounds in gamma networks
ROI engine : return on investment model for the implementation of maintenance best practices
- Maffre, Julien, Probst, Rob, Gunawan, Indra, Neitzert, Thomas
Reliability analysis of gamma interconnection network systems
Analysis of product recall in New Zealand
Terminal reliability assessment of gamma and extra-stage gamma networks
- Gunawan, Indra, Fard, Nasser
- Akbarzadeh Khorshidi, Hadi, Gunawan, Indra, Esmaeilzadeh, Fathollah
Dynamic modeling and validation of post-combustion CO2 capture plants in Australian coal-fired power stations
- Bui, Mai, Gunawan, Indra, Verheyen, Vincent, Artanto, Yuli, Meuleman, Erik, Feron, Paul
Application of numerical design structure matrix method in project management
- Foumani, Mehdi, Ibrahim, Yousef, Gunawan, Indra
Construction productivity analysis of pre-cast and conventional cast-in-situ projects
Implementation of the design structure matrix method in engineering development projects
Are you sure you would like to clear your session, including search history and login status?