- Title
- Disconnection time and sequence of rooftop PVs under short-circuit faults in low voltage networks
- Creator
- Yengejeh, Hadi; Shahnia, Farhad; Islam, Syed
- Date
- 2015
- Type
- Text; Conference proceedings; Conference paper
- Identifier
- http://researchonline.federation.edu.au/vital/access/HandleResolver/1959.17/167265
- Identifier
- vital:13663
- Identifier
-
https://doi.org/10.1109/NAPS.2015.7335127
- Identifier
- ISBN:978-146737389-0
- Abstract
- This paper presents an analysis on the disconnection time of single-phase rooftop PVs, located in a three-phase four-wire low voltage distribution feeder after a line-to-ground short-circuit fault on the low voltage feeder. The paper aims to evaluate and discuss the disconnection time and sequence of PVs in a network with 100% PV penetration level. The impact of different parameters such as the location of the fault, impedance of the fault and the ratio of PVs generation capacity to the load demand are considered. Furthermore, the effect of the system earthing in the form of multiple earthed neutral and non-effectively grounded systems are evaluated on the PVs disconnection time. The analyses intend to figure out the conditions under which the PVs in the feeder may fail to disconnect after a line-to-ground fault and keep feeding the fault. The analyses are carried out in PSCAD/EMTDC software.
- Publisher
- Institute of Electrical and Electronics Engineers Inc.
- Relation
- North American Power Symposium, NAPS 2015; Charlotte, United States; 4th-6th October 2015 p. 1-6
- Rights
- Copyright © 2015 IEEE.
- Rights
- This metadata is freely available under a CCO license
- Subject
- Multiple earthed neutral; Rooftop PVs; Short-circuit faults; Voltage profile
- Full Text
- Reviewed
- Hits: 1029
- Visitors: 1348
- Downloads: 336
Thumbnail | File | Description | Size | Format | |||
---|---|---|---|---|---|---|---|
View Details Download | SOURCE1 | Accepted version | 807 KB | Adobe Acrobat PDF | View Details Download |